Qualification path
What exists today, and the NASA and ECSS software standards it relates to. No qualification evidence exists yet. Mru makes no compliance claim.
Standards
This page maps Mru to four software standards, two from NASA and two from ECSS:
| Number | Title |
|---|---|
| NPR 7150.2 | NASA Software Engineering Requirements |
| NASA-STD-8739.8 | Software Assurance and Software Safety Standard |
| ECSS-E-ST-40C | Space engineering: Software |
| ECSS-Q-ST-80C | Space product assurance: Software product assurance |
The tables below map by topic, not by clause. No clause of any standard has been checked against Mru.
What exists
These activities run today. They are engineering evidence, not qualification evidence: none was planned, reviewed or recorded under a standard.
| Activity | What exists | Related standards |
|---|---|---|
| Unit tests | Unit tests of the core and the C interface, run in CI on every change. See the quorum crate. | NPR 7150.2, ECSS-E-ST-40C |
| Formal proofs | Nine Kani proofs, four on the core and five on the C interface, run in CI on every change. Each has a stated scope. See Kani proofs. | NPR 7150.2, NASA-STD-8739.8, ECSS-E-ST-40C, ECSS-Q-ST-80C |
| Continuous integration | Build and test on Linux x86_64, Linux ARM64 and macOS, plus static ARM Linux binaries tested under emulation and a bare-metal ARM Cortex-M build. | NPR 7150.2, ECSS-E-ST-40C |
| Scenario tests | scripts/scenarios.sh runs the demo program and checks its output: faults, limits, resets and the comparison with fixed TMR. | NPR 7150.2, ECSS-E-ST-40C |
| Bench | 300 runs per host with injected faults on three general-purpose processors, and a known-answer test coverage campaign on the last replica. Not radiation testing, not target hardware. See Bench. | NPR 7150.2, ECSS-E-ST-40C |
| F´ unit tests and system test | 45 unit tests of the F´ components, a 60-case system test against the demo's counts, and the first deployment against the demo in CI. The second deployment ran in orbit on the SEPP on October 28, 2026 (OPS-SAT run 3). See F´ components. | NPR 7150.2, ECSS-E-ST-40C |
| F´ requirements and design notes | Drafts in the flight repo: numbered requirements with a verification method each, and the design notes. Not baselined or reviewed by a program. See fprime-requirements.md. | NPR 7150.2, ECSS-E-ST-40C |
| OPS-SAT experiment exp4051 | Three runs, each in ESA's software environment, on the PRETTY FlatSat and in orbit on the SEPP, October 18, 22 and 28, 2026: the quorum demo twice, the F´ deployment once. Not radiation testing; no real upset in runs 1 and 2, and run 3 had no sensor. See On OPS-SAT and F´ on OPS-SAT. | NPR 7150.2, ECSS-E-ST-40C |
Not started
| Activity | Status | Related standards |
|---|---|---|
| Hardware-in-the-loop testing on target-class processors | Not started | NPR 7150.2, ECSS-E-ST-40C |
| Radiation testing | Not started | Hardware topic, outside the four software standards above |
| Software classification and criticality | Not started | NPR 7150.2, NASA-STD-8739.8, ECSS-Q-ST-80C |
| Requirements traceability | Not started | NPR 7150.2, ECSS-E-ST-40C |
| Independent verification and validation | Not started | NPR 7150.2, NASA-STD-8739.8, ECSS-E-ST-40C |
| Tool qualification (compiler, Kani, test tools) | Not started | NPR 7150.2, ECSS-Q-ST-80C |
| Coding standard compliance | Not started | NPR 7150.2, ECSS-Q-ST-80C |
| MC/DC structural coverage | Not started | NPR 7150.2, ECSS-E-ST-40C |
| Software development and assurance plans | Not started | NPR 7150.2, NASA-STD-8739.8, ECSS-E-ST-40C, ECSS-Q-ST-80C |
Status as of October 29, 2026, flight v0.7.0. The F´ components, the deployment and the C interface have numbered requirements, each with a verification method, but no trace to mission or standard requirements.