MMruDocs

Qualification path

What exists today, and the NASA and ECSS software standards it relates to. No qualification evidence exists yet. Mru makes no compliance claim.

Standards

This page maps Mru to four software standards, two from NASA and two from ECSS:

NumberTitle
NPR 7150.2NASA Software Engineering Requirements
NASA-STD-8739.8Software Assurance and Software Safety Standard
ECSS-E-ST-40CSpace engineering: Software
ECSS-Q-ST-80CSpace product assurance: Software product assurance

The tables below map by topic, not by clause. No clause of any standard has been checked against Mru.

What exists

These activities run today. They are engineering evidence, not qualification evidence: none was planned, reviewed or recorded under a standard.

ActivityWhat existsRelated standards
Unit testsUnit tests of the core and the C interface, run in CI on every change. See the quorum crate.NPR 7150.2, ECSS-E-ST-40C
Formal proofsNine Kani proofs, four on the core and five on the C interface, run in CI on every change. Each has a stated scope. See Kani proofs.NPR 7150.2, NASA-STD-8739.8, ECSS-E-ST-40C, ECSS-Q-ST-80C
Continuous integrationBuild and test on Linux x86_64, Linux ARM64 and macOS, plus static ARM Linux binaries tested under emulation and a bare-metal ARM Cortex-M build.NPR 7150.2, ECSS-E-ST-40C
Scenario testsscripts/scenarios.sh runs the demo program and checks its output: faults, limits, resets and the comparison with fixed TMR.NPR 7150.2, ECSS-E-ST-40C
Bench300 runs per host with injected faults on three general-purpose processors, and a known-answer test coverage campaign on the last replica. Not radiation testing, not target hardware. See Bench.NPR 7150.2, ECSS-E-ST-40C
F´ unit tests and system test45 unit tests of the F´ components, a 60-case system test against the demo's counts, and the first deployment against the demo in CI. The second deployment ran in orbit on the SEPP on October 28, 2026 (OPS-SAT run 3). See F´ components.NPR 7150.2, ECSS-E-ST-40C
F´ requirements and design notesDrafts in the flight repo: numbered requirements with a verification method each, and the design notes. Not baselined or reviewed by a program. See fprime-requirements.md.NPR 7150.2, ECSS-E-ST-40C
OPS-SAT experiment exp4051Three runs, each in ESA's software environment, on the PRETTY FlatSat and in orbit on the SEPP, October 18, 22 and 28, 2026: the quorum demo twice, the F´ deployment once. Not radiation testing; no real upset in runs 1 and 2, and run 3 had no sensor. See On OPS-SAT and F´ on OPS-SAT.NPR 7150.2, ECSS-E-ST-40C

Not started

ActivityStatusRelated standards
Hardware-in-the-loop testing on target-class processorsNot startedNPR 7150.2, ECSS-E-ST-40C
Radiation testingNot startedHardware topic, outside the four software standards above
Software classification and criticalityNot startedNPR 7150.2, NASA-STD-8739.8, ECSS-Q-ST-80C
Requirements traceabilityNot startedNPR 7150.2, ECSS-E-ST-40C
Independent verification and validationNot startedNPR 7150.2, NASA-STD-8739.8, ECSS-E-ST-40C
Tool qualification (compiler, Kani, test tools)Not startedNPR 7150.2, ECSS-Q-ST-80C
Coding standard complianceNot startedNPR 7150.2, ECSS-Q-ST-80C
MC/DC structural coverageNot startedNPR 7150.2, ECSS-E-ST-40C
Software development and assurance plansNot startedNPR 7150.2, NASA-STD-8739.8, ECSS-E-ST-40C, ECSS-Q-ST-80C

Status as of October 29, 2026, flight v0.7.0. The F´ components, the deployment and the C interface have numbered requirements, each with a verification method, but no trace to mission or standard requirements.