Architecture status
The whitepaper describes six layers and the parts they share. This page shows where each part stands today: what is built, where the code is, and what evidence supports it.
For the design itself, read the architecture overview or the whitepaper. Section numbers on this page refer to the whitepaper.
Status levels
Each part has one of five levels. A part moves up only with the evidence the level names.
| Level | Meaning |
|---|---|
| Paper | Described in the whitepaper. No code. |
| Spec | A written specification: interfaces, data formats and the properties to prove. No code. |
| Prototype | Code with tests or proofs, run on general-purpose processors. Not measured on target hardware. |
| Bench-tested | Measured on target-class processors with injected faults. Results published. |
| Deployed | Ran in orbit or at a field site. Logs published. |
Layers 0 to 5
Only Layer 1 has code today. Layers 0 and 2 to 5 are not built. They exist only in the whitepaper.
| Layer | Whitepaper | Code | Status | Evidence |
|---|---|---|---|---|
| 0 · Survival kernel | §7 | Not built | Paper | None |
| 1 · Hardware consensus and health | §8 | quorum crate, demo, F´ components | Deployed, partial | Sixteen Kani proofs, the scenario checks and 59 F´ unit tests in CI, a known-answer test coverage campaign, an F´ system test against the demo, two F´ deployments (MruOpsSat, andMruQuorum with each replica in a process of its own) run full length in ESA's OPS-SAT experiment environment under emulation, bench on general-purpose processors, Dusk, and on the SEPP flight processor (exp4051) the quorum demo, on the OPS-SAT PRETTY FlatSat (October 16 and 21, 2026) and in orbit (October 18 and 22, 2026), and the F´ deployment MruQuorum, on the FlatSat and in orbit (October 28, 2026), and again in run 4 with automatic resets, sensor selection, a cFS application and real bit flips made by software (November 20, 2026), logs published. |
| 2 · Navigation and orientation | §9 | Not built | Paper | None |
| 3 · Science and knowledge triage | §10 | Not built | Paper | None |
| 4 · Communication | §11 | Not built | Paper | None |
| 5 · Bounded self-modification | §12 | Not built | Paper | None |
Layer 1, part by part
Section 8 gives Layer 1 five parts. The shrinking quorum is built. The health registry is partly built. The other three are not started.
| Part | Status | What exists |
|---|---|---|
| Shrinking quorum | Deployed | quorum::mode and quorum::decide: vote on three, compare on two, self-check on one. no_std, no allocation, builds for ARM Cortex-M. The F´ component RedundancyManager runs it through a C interface that Kani proves equal to the core. The quorum demo ran it on the OPS-SAT SEPP, a Cortex-A9 flight processor, on the FlatSat and in orbit, twice: three software replicas on one processor, faults from a schedule. The second run went from three replicas to one and halted safely with no wrong result when the last one failed its known-answer test. On October 28, 2026, RedundancyManager ran it there too, in the second F´ deployment: each replica a process of its own on the SEPP's two cores, a real process kill, and 342 correct results and 0 wrong in the shrinking-quorum segment. See F´ on OPS-SAT. |
| Node health registry | Deployed, partial | quorum::Health counts strikes per replica. Three strikes within 200 ticks start a known-answer test, which retires or clears the replica. The F´ component HealthRegistry holds the record. The whitepaper's score of error rate, response time and gate use is not built. quorum::Health ran in all four OPS-SAT runs in orbit and retired each stuck replica. The retired replica stayed retired across a kill and a resume from a checkpoint in run 2, and across a kill and a restore from the F´ manager's state file in run 3, with HealthRegistry. |
| Memory scrubbing | Paper | Listed as the F´ ScrubScheduler, not started. The demo's radiation sensor checks a memory block for bit flips. It counts upsets. It does not scrub. |
| Hardware inventory and cannibalization | Paper | Not started. RedundancyManager can admit a spare into a replica slot after a known-answer test; choosing when is the inventory's job. Dusk models salvaged spares in simulation only. |
| Power accountant | Paper | Listed as the F´ PowerAccountant, not started. RedundancyManager can put a replica on standby, the hook it will use. |
F´ component status from docs/fprime-design.md in mruspace/flight.
Shared parts
These parts serve every layer.
| Part | Whitepaper | Status | What exists |
|---|---|---|---|
| Duty-cycle scheduler | §4.5 | Paper | None. The whitepaper does not yet assign it to a layer. |
| Memory tiers | §4.3 | Paper | None. |
| Degradation model and mission phases | §13 | Paper | None. Dusk models processor loss, not the power phases. |
| Simulation framework | §14 | Prototype, partial | Dusk models processor failures, correlated failures, salvaged spares and upsets. It does not model power decay, thermal limits, memory decay or science targets. |
Section 14 names six metrics. Dusk reports useful work, wrong results and the day output ends, which is survival duration. The other five need power and science models that Dusk does not have yet. Dusk's parameters are illustrative, not calibrated. The bench measures useful work, survival and the Graceful Degradation Index on real processes.
Products and research
- Mru Flight is Layer 1 for spacecraft. The F´ components
RedundancyManager,HealthRegistry,ReplicaHostandSensorVoterare built and tested: 59 unit tests with the three test-only components, a system test against the demo's counts on the bench schedules, and two F´ deployments, the second with each replica in a process of its own. The same core also runs as an application of NASA's core Flight System, which ran in orbit in run 4. The quorum demo, without F´, ran in orbit on ESA's OPS-SAT PRETTY satellite on October 18 and 22, 2026 (exp4051), and the second F´ deployment ran there on October 28, 2026, and again on November 20, 2026 with the cFS application: three software replicas on one Linux payload processor, with faults from a schedule or an F´ command sequence, and in run 4 real bit flips made by software. All four runs matched the prediction written before them. - Mru Field is the same Layer 1 core for systems on Earth that are hard to reach: a supervisor that runs an operator's task as three replicas on one Linux processor. Version 0.3.0, with staged updates and flood limits, is built and tested on the bench, at the Prototype level. It has not run on a board in a system yet. See Mru Field.
- Dusk is the first part of the §14 simulation framework.
- Mru 2049 is not part of the layers. It is a browser flight simulator on real astronomical data.
What comes next
In order:
- Run the full bench on target-class processors. The quorum demo has run twice and the F´ deployment once on a flight processor, on the FlatSat and in orbit; the 300-run bench with reboots and power cuts has not.
- Calibrate Dusk with radiation or flight data. Its policy model is already checked against the bench.
- Specify Layer 0. The instruction set, the format of behavior programs, the integrity check against Tier 0, and the properties to prove. Code starts after the specification.
Related
- Architecture overview: the six layers and the descent, on mru.space
- Shrinking quorum: the Layer 1 rule, what is proved and what is tested
- Qualification path: what exists against the NASA and ECSS software standards
- Dusk: 10,000 missions, 1.34× the useful work of fixed TMR. This assumes no ground support after launch. The gain falls to 1.00× when support never ends. See Ground support.
Updated November 18, 2026 · Edit on GitHub · Questions? Get in touch